PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bolting the steel arch at Derrick -2 Facing North (800x600).jpg Compacted soil inside Stair -4 pit Facing East (800x600).jpg Manholes Facing South (800x600).jpg Placing manhole by the bridge Facing Cherry Street (800x600).jpg Underground roughing along column line 2.5 from G-K Facing West (800x600).jpg
Previous page Underground roughing along column line 2.5 from G-K Facing West (800x600)
Underground roughing along column line 2.5 from G-K Facing West (800x600)